Chapters
Chapter 3 - Power Take-Off
Assembly page 74
POWER TAKE OFF SHAFTRM-655Fig. 49—Checking Bearing Preload163. ASSEMBLY.To assemble the power take-off adapter, position the sleeve on theshaft, and secure it to the shaft with a rivet (fig. 47). Install thebearing and shaft assembly in the housing with the sleeve end of theshaft towards the rear of the housing (fig. 47). Press the oil seal(fig. 47) in the bearing retainer. Install the bearing retainer, shims,and guard on the housing. Adjust the preload to 5 to 12 pounds-inches by increasing the shim pack to reduce the preload or bydecreasing the shim pack- to increase the preload.To assemble the power take-off shaft assembly, press the oil seal(fig. 48) in the cover. Press the cover assembly onto the shaft andbearing. Install the rear snap ring in the cover. Install the cover cap.§ 163.3 730-4 7J74Torque WrenchFree to read online. Contents · Where is the serial number on a 9N, 2N or 8N?
