Chapters
Chapter 2 - Transmission
Assembly page 68
Fig. 16—Shift Rails and Shift Forksone 0.005 inch shim will increase the torque approximately 10 pounds-inches. Adding a 0.005 inch shim will decrease the torque a likeamount.Install the two lower shift rails and shift forks making sure that thedeep square cornered slots face inward on both rails. Install the inter-lock ball spring and nut on each side of the housing. Install the mainshaft assembly being careful not to damage the gear teeth. Install therear main shaft bearing retainer assembly, using the metal shim packpreviously removed and identified. Install the main drive gear bear-ing retainer assembly and gasket. Position all shift rails and forks inthe neutral position and measure the torque required to turn the mainshaft. Several turns should be completed so that the bearings will beproperly seated. After the shift is turning uniformly, the torqueshould be from 20 to 35 pounds-inches. Add or remove shims as3730-47J§133.f.68FIRST AND THIRD GEAR SHIFT RAIL—7240THIRD AND FIRST GEAR SHIFT FORK—7230NUT-33911-SBOLT —7245REVERSE GEAR SHIFT RAIL—7242NUT-33911-SBOLT —7245REVERSE GEAR SHIFT PLATE-7216SECOND AND FOURTH GEAR SHIFT PLATE—7225SECOND AND REVERSE SHIFT FORK-7231BOLT7245NUT—33911-SSECOND AND FOURTH SHIFT RAIL-7241SECOND AND FOURTH GEAR SHIFT FORK-7236RM-615Free to read online. Contents · Where is the serial number on a 9N, 2N or 8N?
